Skip to main content
Emergency Department, Beaumont Hospital
Royal Oak, MI
Emergency Department, Beaumont Hospital
Design that saves lives.
Advancing emergency care.
Meeting rising demand; exceeding expectations.
One of the top five largest—and busiest—emergency departments in the county and the only Level I Trauma Center in Oakland Country, Beaumont Emergency Center is a critical provider of emergency medical care for the entire state of Michigan.

Facing an influx of patients that strained space, staff and resources, Beaumont’s redesign goals were clear: accommodate the largest possible number of exam and patient observation rooms; expedite intake and improve organization; and create space both within the existing footprint, and through a substantial new addition.

Immense by emergency center standards, the completed project nearly doubles the size of the previous facility increasing efficiency and organization; expediting intake, triage and treatment; elevating Beaumont's standard of care; and saving lives.
/4
1
2
3
4
Results
Beaumont Hospital's Emergency Department expansion has been recognized as a recipient of an Engineering Society of Detroit Construction and Design Award.
Beaumont’s renovation and new addition increase organization and efficiency, maximize space, improve response time and enhance patient care.
The completed project adds 107 new exam rooms and four new post-triage trauma bays, and upgrades 127 patient rooms and 50 medical observation beds.
Relocating the helipad to the rooftop provides dedicated access to the Emergency Department, expediting treatment for remote emergencies.
Throughout construction, we ensured the emergency center remained fully functional, providing uninterrupted service to patients and families.
Having worked on over 1 million square feet of Beaumont’s campus, HED understands how to manage complex projects with multiple phases like this one. We are proud to continue our strong partnership with Beaumont.”
Kshipra Rele, RA, LEED AP, EDAC
Associate
HED
Project Data
Emergency Department Expansion 2014-10101-000
Beaumont Services Corporation
Royal Oak, MI
PROJECT SCOPE
Addition
HED ROLE
Design Architect, Structural Engineering, Mechanical/ Plumbing Engineering, Electrical Engineering
RSF/GSF
156,000
CONSTRUCTION COST
$64.0 Million
SUSTAINABILITY LEVEL
    LEED Certified Equivalent
Project Team
  • Joseph Furwa
    AIA, LEED AP
    Principal
    Architecture Leader
  • Stephen Milz
    PE
    Associate Principal
    Electrical Engineering
  • Jason Waddell
    Mechanical Design
  • Kshipra Rele
    RA, LEED AP, EDAC
    Associate Principal
    Architecture
  • Lauren Roller
    PE
    Associate Principal
    Structural Engineering
  • Edward Kaffel
    Assoc. AIA, LEED AP
    Design
  • Megan Crawford
    PE
    Associate Principal
    Structural Engineering
  • Brandon Watts
    Mechanical Design
  • Ching Luk
    AIA
    Associate
    Architecture and Design
  • Michael Wysocki
    Associate
    Electrical Design
Advancing emergency care.
Emergency Department, Beaumont Hospital
Royal Oak, MI
PROJECT DATA
PROJECT TEAM
Design that saves lives.